Discover
Our achievements

Modular oxidant skid for the production of hair care products in Russia
Design and manufacture of a modular oxidizer skid for the production of shampoos, hair conditioners and hair colorings in Russia.

Prefabrication of piping for the construction of an ethylene plant in the United States
Prefabrication of 3,000 tons of piping for the cooling system on this project to expand a petrochemical complex in Texas.

Turnkey plant for the production of carrot juice
Our teams designed an entire production line. A global approach taking into account the customer’s needs at each step, from the line design to its installation, including the employees training.

Expansion of the production capacities of a cosmetics factory
This plant-based cosmetics brand worked with Boccard to increase the production capacity of its factory in France.

Greenfield of a blood fractionation plant in Canada
Our teams have designed, manufactured, qualified and commissioned the key equipment for the largest blood fractionation plant in Canada of this Korean group.

Dismantling of Superphénix NNS in Creys-Malville, France
The Boccard teams were involved in the design phase as well as in the studies and turnkey construction of two treatment lines designed to transform

Construction of a new brewhouse for the Abbey “Trappistes de Rochefort”
The Abbey “Trappistes de Rochefort” wanted to design and construct its new brewhouse. They trusted in the expertise of our Belgian teams from Meura: a company from Boccard dedicated to brewery, distillery and grain extract projects.

Kvass extract production line for Coca-Cola in Ukraine
Coca-Cola’s R&D teams teamed up with our brewhouse experts to design a new technology for producing “Kvass” extracts in Ukraine. Coca-Cola’s R&D teams teamed up with our brewhouse experts to design a new technology for producing “Kvass” extracts in Ukraine.

ATEX revamping of perfume manufacturing site
Upgrading to ATEX standards, revamping and extension of a perfume production unit on for a prestigious French perfume company.

Design, construction and commissioning of an injectables production unit
Boccard undertook the project to design and build a turnkey workshop fro injectables for a major player in the pharmaceutical markets

The design & build of the process package of the Sinnamary biomass plant for VOLTALIA
The design & build of the process package of the Sinnamary biomass power plant, with a capacity of 10MWe (40MWth), located in French Guyana.

Soap manufacturing unit
In order to increase its production capacities, this company requested Boccard’s expertise to create a new automated production unit for anioxide soap.

Extension of a production plant for crepes and pastry doughs
Our teams designed, manufactured and implemented process solutions to increase the capacity of this American crepes and pastries factory.

Manufacturing of piping modules for the cryogenic lines of the Large Hadron Collider of the European Council for Nuclear Research in Switzerland
CERN’s Large Hadron Collider (LHC) is a 27 km ring, buried to a depth of 100 meters, near the French-Swiss border in Geneva. It is the most powerful particle accelerateur in the world.

Design and construction of a new factory dedicated to the production of hair care products in Egypt
For a new Greenfield factory located near Cairo, this cosmetics company called on Boccard for its expertise in cosmetic installations.

Prefabrication of pipes for Crescent Dunes Solar Energy
On this ambitious project, Boccard teams prefabricated more than 1200 tons of piping.
The new biomass power plant, with a power of 10MWe (40MWth), is located near the Petit-Saut dam in the commune of Sinnamary in French Guiana:
Complete continuous heat treatment unit for vegetable proteins
Boccard conceived a system that allows the continuous processing of the vegetable protein, a highly viscous material. The plant is now operating without production interruption, 24 hours a day, 7 days a week.

Piping construction on an oil rig in Malaysia
This construction and installation project of 14,000 tons of piping mobilized up to 400 people for 20 months, including 800,000 hours of work without any accident.

Studies of cooling circuits as part of the refurbishment of the B Arcelor Mittal blast furnace in Ghent, Belgium.
ArcelorMittal in Ghent has 2 blast furnaces which are the heart of their production The blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. Today it is the turn of blast furnace B to undergo such an operation.

Prefabrication and installation of spools in record time for a refinery in Colombia
Our teams specialized in pipe prefabrication have produced more than 64,000 spools for a refinery in Colombia.

Workshop for the purification of animal oil for Omega 3
Novasep, a service provider in the field of production and purification of molecules for the life sciences and the chemical industry, turned to Boccard for the development and industrialization of its processes to obtain new molecules. Boccard designed, constructed and commissioned this workshop in the largest chromatography purification plant in the world.
You have a project ?
Our Customers
They trust us