Discover
Our achievements

Kvass extract production line for Coca-Cola in Ukraine
Coca-Cola’s R&D teams teamed up with our brewhouse experts to design a new technology for producing “Kvass” extracts in Ukraine. Coca-Cola’s R&D teams teamed up with our brewhouse experts to design a new technology for producing “Kvass” extracts in Ukraine.

Increase production capacities in a recombinant protein production plant
Our expert teams in Pharma & Biotech designed and supplied a complete unit for the production of recombinant proteins to increase the production capacities of the Belgian site of one of the largest manufacturers and suppliers of products and services for genomics and proteomic,

Manufacturing of piping modules for the cryogenic lines of the Large Hadron Collider of the European Council for Nuclear Research in Switzerland
CERN’s Large Hadron Collider (LHC) is a 27 km ring, buried to a depth of 100 meters, near the French-Swiss border in Geneva. It is the most powerful particle accelerateur in the world.

Design, manufacture and commissioning of a lotions manufacturing platform
Design, manufacture and commissioning of a 10T skid for the storage and manufacture of mineral water and the production of various lotions for the Vichy and La Roche-Posay brands.
Manufacturing of skids for a uranium mining project in Nigeria
We carried out the design studies as well as the fabrication of four stainless steel skids for one of the largest open pit uranium mining complexes in the world.

Turnkey plant for the production of carrot juice
Our teams designed an entire production line. A global approach taking into account the customer’s needs at each step, from the line design to its installation, including the employees training.

Prefabrication of piping for the construction of an ethylene plant in the United States
Prefabrication of 3,000 tons of piping for the cooling system on this project to expand a petrochemical complex in Texas.

Construction of a new brewhouse for the Abbey “Trappistes de Rochefort”
The Abbey “Trappistes de Rochefort” wanted to design and construct its new brewhouse. They trusted in the expertise of our Belgian teams from Meura: a company from Boccard dedicated to brewery, distillery and grain extract projects.
Turnkey food flavoring plant in the United States
We accompanied a long-standing partner in its opening to the American market. Boccard US has the know-how in turnkey plants and a deep knowledge of local standards, the ideal partner for this project.

Studies and construction of piping for the nuclear island of the Flamanville EPR
NUCLEAR Our teams of specialists in the nuclear sector have been commissioned to design and build the piping for the nuclear island outside the steam

Studies of cooling circuits as part of the refurbishment of the B Arcelor Mittal blast furnace in Ghent, Belgium.
ArcelorMittal in Ghent has 2 blast furnaces which are the heart of their production The blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. Today it is the turn of blast furnace B to undergo such an operation.

Design and installation of a Greenfield greek yogurt factory in less than one year
Discover the success story of the Chobani yogurt plant in the United States. In less than a year, our teams designed, manufactured, installed and commissioned the world’s largest Greek yogurt plant, which was named “Plant of the Year”. A major greenfield factory project which

Monoclonal antibody (mAbs) production unit
Boccard was chosen for its expertise in monoclonal antibodies and disinfection as well as for its know-how in GMP design (good manufacturing practices).

Complete technological system for water filtration in a food processing plant
In response to changes in sanitary standards, we intervened in our client’s plant to regulate its equipment rinsing system and the filtration of the water used.

Turnkey plant for the manufacture of body and hair care products
On behalf of a Swedish company, Boccard built a turnkey plant dedicated to the production of body and hair care products in Russia.

Piping construction on an oil rig in Malaysia
This construction and installation project of 14,000 tons of piping mobilized up to 400 people for 20 months, including 800,000 hours of work without any accident.

Prefabrication of pipes for Crescent Dunes Solar Energy
On this ambitious project, Boccard teams prefabricated more than 1200 tons of piping.
The new biomass power plant, with a power of 10MWe (40MWth), is located near the Petit-Saut dam in the commune of Sinnamary in French Guiana:

Transfer and increase production capacity of 2 blood fractionation workshops
To increase its production capacity for plasma-derived drugs, LFB called on Boccard Health & Care.

R&D fermentation platform for the production of hyaluronic acid
Boccard carried out the design, manufacture, qualification and commissioning of a fermentation platform with a capacity of 1000L.

Prefabrication and installation of spools in record time for a refinery in Colombia
Our teams specialized in pipe prefabrication have produced more than 64,000 spools for a refinery in Colombia.

Design, construction and commissioning of an injectables production unit
Boccard undertook the project to design and build a turnkey workshop fro injectables for a major player in the pharmaceutical markets
You have a project ?
Our Customers
They trust us