
Testimonial from Guy
An example of career development at Boccard.
“30 years at Boccard, as many twists and turns between Europe and Asia, and never a routine.”
An example of career development at Boccard.
“30 years at Boccard, as many twists and turns between Europe and Asia, and never a routine.”
On this large scale project, Boccard’s teams were responsible for the EPC including the electromechanical aspects of the new diesel power plant. The plant integrates tarpaulins, framework, piping, electricity and equipment assembly.
On this project, the Boccard teams were entrusted with the realization of the Turbine and Steam Cycle lot.
Boccard is in charge of the EPC Fluids lot: design, studies, implementation and start-up of the fluid systems.
This construction and installation project of 14,000 tons of piping mobilized up to 400 people for 20 months, including 800,000 hours of work without any accident.
Prefabrication of 3,000 tons of piping for the cooling system on this project to expand a petrochemical complex in Texas.
Our teams specialized in pipe prefabrication have produced more than 64,000 spools for a refinery in Colombia.
We carried out the design studies as well as the fabrication of four stainless steel skids for one of the largest open pit uranium mining complexes in the world.
The Romanian sheet and plate producer ArcelorMittal Galati has called on Boccard’s teams to restart its blast furnace number 5.
ArcelorMittal in Ghent has 2 blast furnaces which are the heart of their production The blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. Today it is the turn of blast furnace B to undergo such an operation.
Copyright Boccard 2023– All rights reserved – Sitemap – Legal notice– Data protection policy RGPD– Cookie policy
Nous serons heureux de répondre à vos demandes concernant nos offres marchés, solutions ou services. Pour nous aider à mieux vous répondre, merci de préciser votre besoin : devis, projet, services, demande de contact ou autre.