Studies of cooling circuits as part of the refurbishment of the B Arcelor Mittal blast furnace in Ghent, Belgium

PROJECT ESSENTIALS

ArcelorMittal in Ghent, Belgium has 2 blast furnaces which form the heart of their production. Blast furnaces operate for 20 to 25 years, after which the refractory lining must be renewed. 

Our teams intervened for the repair of blast furnace B. They carried out basic and detailed studies of the cooling circuits, gas washing circuits and a granulation circuit outside the square tower.

The new blast furnace is more efficient in terms of fuel consumption thanks to the recycling of wood waste as well as the injection of waste gases and plastic .

key points

12 months of intervention
About 5,000 tonnes of steel and 3,000 tonnes of refractory materials were used for the blast furnace
265 kilometers of electric cables have been laid.

EQUIPMENT and services PROVIDED

  • Process study

  • P&ID diagrams

  • Design of new cooling, washing and pelletizing circuits

  • Material lists

  • 3D model of pump rooms and racks (design)

  • Construction drawings (layouts, isometrics, platforms and support drawings)

  • Ortho drawings

  • Concrete guide drawings

  • Head loss calculations and determination of operating points

  • Flexibility calculations

  • Platform and structure calculations

  • Technical standards

  • Tender specifications

  • Material specifications

other ACHIEVEMENTS

For Steel Industry & Mining

PROJET
Evolutive Vaccines Facility for Sanofi

Our teams are proud to have been awarded a new contract by Sanofi for carrying out mechanical installation works for the Black and Clean Utilities Lots of the Evolutive Vaccines Facility (EVF) project located in Neuville-sur-Saône (Rhône - France).

Read more
PROJET
EPC contract in the Voltalia Cacao Biomass power plant, French Guiana

The EPC contract includes the engineering, procurement, construction and commissioning of the boiler island, the water/steam cycle including the turbine and its utilities, as well as the high and low voltage electrical equipment and control of the unit.

Read more
PROJET
Boccard will participate at the international exhibition ALLPACK INDONESIA 2022

Boccard Indonesia will participate at the international exhibition  ALLPACK INDONESIA 2022.   This 21th edition will take place on 12-15 October 2022 in Jakarta and will focus on Processing, Automation, Handling for Food & Beverage, Pharmaceutical and Cosmetic Industries.  Boccard accompanies key market players  around the world in all phases of their industrial project's lifecycle, from […]

Read more
Follow us
Quick navigation
Copyright Boccard 2021 / All rights reserved
CookiesLegal NoticeGDRP
arrow-right
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram