Accelerated time-to-market: shorter lead times, faster on-site installation, quicker start-up, minimal downtime when integrated into an existing installation
High-quality construction & traceability: the system is built under ideal conditions in our workshops. Dynamic Factory Acceptance Tests (FAT) are performed by our trained and experienced teams. FATs are consolidated by SATs which allow us to reduce the installation time on site.
Economical: skids are faster to build and transport, require less labor, do not interrupt ongoing operations, and do not require a plant shutdown.
We design to build (Design-Build)
We design facilities to ameliorate your TCO and reduce your OPEX
We master the design methods for installations of various sizes and markets: from stainless steel skids for the pharmaceutical industry to multi-ton modules for the oil & gas industry